First North, now South – the start of the year is and remains positive!
Zu allen NeuigkeitenPower Service Solutions GmbH has been awarded the contract for the delivery and installation of two deslagger systems for a waste-to-energy plant in in southern Germany.
Due to current wear and tear, the existing components on two incineration lines need to be replaced. This measure is necessary to ensure the required availability of the incineration lines in the future.
The replacement delivery consists of a push slag remover, a slag chute and a grate riddling conveyor system for two lines. This also includes all I&C components and integration into the process control system if signals deviating from the existing system are required. In addition to engineering, manufacturing and delivery, we are also responsible for dismantling and installation for the new components. Implementation of both lines is scheduled for autumn 2026.
We are looking forward to continuing our successful collaboration with our customer from southern Germany and would like to express our sincere thanks for their trust.

